Sample claim (fictional)

This is what comes back.

A whole Claim Basis Report on a fictional claim, with the key to reading it first.


Sample claim (fictional)

Claim Basis Report

Every name, address, policy, estimate, weather reading and record in this sample is invented.

Property
1200 Harbor Row, Port Ellis, TX (fictional)
Building
Two-story mixed-use: ground-floor retail unit, two apartments above (2A, 2B)
Line
Commercial property
Peril
Wind and hail
Date of loss
14 May 2026
Date reported
16 May 2026
Insurer
Example Mutual Insurance Company (fictional)
File received
14 files · 212 pages

Property facts, each with its public-record reference

  • Year built: 1998county appraisal record, p.1
  • Stories: 2county appraisal record, p.1
  • Main roof: low-slope modified bitumencontractor aerial measurement report, p.2
  • Front: mansard with laminated shinglesinsurer field photos, p.7
  • Last roof permit on record: none foundcity permit index search, p.1

Recorded weather near the property on the reported date of loss, with its source

  • Peak wind gust 61 mph on 14 May 2026, weather station 4.8 miles from the property
  • Hail reports of 1.0 to 1.25 inches within 5 miles on the same date

Result: recorded weather near the property on the reported date of loss is listed above, with its source. The report does not say what caused any specific damage.

Report note: the endorsement is quoted because one estimate includes a code-related line (line 7). The report does not decide whether the endorsement applies.

Estimate A = insurer estimate, version 2 (24 June 2026). Estimate B = contractor estimate (10 June 2026).

Difference summary (amounts only, no position taken): 2 reconciled · 3 variance · 2 undetermined.

  1. 1HVAC inspection report for the rooftop unitCloses line 3
  2. 2Building permit application for the roofShows whether line 6 is required
  3. 3Profit-and-loss statements for the retail unit, Jan–May 2025 and Jan–May 2026Closes line 7
  4. 4Contractor's price source for ceiling tileExplains line 4
  5. 5Moisture readings for Apt 2BSupports line 5 scope
DateEventPage
14 May 2026Date of loss statedLoss notice p.1
16 May 2026Claim reportedLoss notice p.1
21 May 2026Insurer inspectionField notes p.2
3 Jun 2026Insurer estimate, version 1Estimate A v1 p.1
10 Jun 2026Contractor estimateEstimate B p.1
24 Jun 2026Insurer estimate, version 2Estimate A v2 p.1
26 Jun 2026Insurer letter requests HVAC inspection reportLetter p.1
Gapno reply to the 26 June request is in the file

The comparison against state handling periods is produced only for the party handling the claim, and is not shown in the public sample.

Method
Edition 1, published 28 September 2026
Rule set
2026.01
Inputs
14 files · 212 pages · fingerprint 9f3c…a71e (fictional)
Outside sources checked
Weather records for the date of loss; county appraisal record; city permit index
Reviewed by a person
3 flagged items (lines 3, 6, 7); reviewer did not see who ordered
Decisions
None. The record measures the file and stops
Reproduce
Same files + same method edition = same record

Sample claim (fictional). The sample uses invented documents. Your report uses your file.